Featured Case Studies
Our Projects
At Wilson, we deliver reliable solutions to NZ’s construction, infrastructure, and property sectors. Our teams have supported several major construction projects, contributing our expertise in precast, reinforcing, and tunnelling solutions that stand the test of time.
Wilson precast is one of the largest suppliers of quality precast concrete in New Zealand with over 30 years’ experience in commercial, residential and civil infrastructure sectors. We will provide you a superior precast concrete solution tailored to meet Engineer, Architect and Customer needs and requirements.

Wilson Precast partnered with Built to deliver the full structural precast package for two premium data centre developments by Canberra Data Centres (CDC) in Hobsonville. Spanning from early 2024 to late 2025, this multi-stage project demanded precision, consistency, and the capacity to deliver at scale.

The Central Interceptor project included the manufacture of specialised precast segments for seven vertical shafts, distinct from the TBM tunnel lining segments. These segments were designed for 5.5m and 6.6m diameter shafts, incorporating internal dividing walls and service shelves, with individual units weighing up to 28 tonnes. The complexity of these components made moulding, manufacturing, and transport particularly challenging. Each unit was required to be water-tight, demanding exceptional attention to detail and quality control throughout production.

Wilson Precast played a key role in the delivery of the Great North Road Interchange, a major component of Auckland’s Western Ring Route. Completed in 2015 for the Well Connected Alliance and NZTA, the project comprised four overbridge ramps connecting traffic from the Waterview Tunnels and West Auckland through to the city. Wilson Precast manufactured and supplied 296 × 1,525mm-deep Super Tee bridge beams, each weighing more than 65 tonnes. The scale of the project required careful coordination across manufacturing, transport, and installation to meet demanding programme and logistical requirements.









